Roshana Takim, Akintola Akintoye and John Kelly (2004)
questionnaire survey, Analysis of Variance (ANOVA), factor analysis, success measures,
Malaysia
Takim, R, Akintoye, A and Kelly, J (2004) Analysis of measures of construction project success in Malaysia. In: Khosrowshahi, F (Ed.), 20th Annual ARCOM Conference, 1-3 September 2004, Heriot Watt University. Association of Researchers in Construction Management, Vol. 2, 1123-33
-----------------------------------------------------------------------------------------------
Takim, R, Akintoye, A and Kelly, J (2003) Performance measurement systems in construction. In: Greenwood, D J (Ed.), 19th Annual ARCOM Conference, 3-5 September 2003, University of Brighton. Association of Researchers in Construction Management, Vol. 1, 423-32.
----------------------------------------------------------------------------------
Takim, R and Akintoye, A (2002) Performance indicators for successful construction project performance. In: Greenwood, D (Ed.), 18th Annual ARCOM Conference, 2-4 September 2002, University of Northumbria. Association of Researchers in Construction Management, Vol. 2, 545-55.
--------
Takim, R, Akintoye, A and Kelly, J (2003) Process Improvement Programmes For Construction Project Development InMalaysia. 1st Scottish Conference for Postgraduate Researchers of the Built and Natural Environment , Egbu, C., and Tong, M. (Eds), Glasgow Caledonian University, November 2003, pp. 187-199, ISBN 1 903661 50 1 [PDF]
----------------------------------------------------------
Wieloch, M., Takim, R. and Subashini, H. (2003) An Optimised Concrete Composite Design For Enhanced Building Performance. 1st Scottish Conference for Postgraduate Researchers of the Built and Natural Environment , Egbu, C., and Tong, M. (Eds), Glasgow Caledonian University, November 2003, pp. 503-511, ISBN 1 903661 50 1 [PDF].
-----------------------------------------------------------
No comments:
Post a Comment